Activity data answers a narrow question well and a broad one badly. Here is the difference, and what to measure instead.

Most companies that install tracking software are trying to answer "is this remote team working?" The data they get back answers a much narrower question, and the gap between the two is where the damage happens.

What does the activity percentage actually measure?

The share of time intervals that contained a keypress or a mouse movement. That is it.

Work that scores high: data entry, email, chat, writing code at speed. Work that scores low: reading a specification, a long client call, thinking through an architecture, reviewing someone else's work, whiteboarding, debugging by staring at a log.

The second list contains most of the senior work in any company. Rank a team by activity percentage and you will systematically rank your most experienced people last. That is not a calibration problem to be tuned away; it is what the metric measures.

What happens when you use it as a score?

People optimise for it, because people always optimise for the measure they are judged on. Within a month you get mouse-jiggler software, documents typed into and deleted, and a team that has learned the company cannot tell the difference between work and the appearance of work.

The measurement has then destroyed the thing it was trying to observe, and you cannot undo it by explaining that you did not mean it that way.

So what should you measure?

Questions worth asking, and what answers them
QuestionMeasureWhere it comes from
Is this retainer profitable?Hours per client against contracted hoursTime tracked against a project
Is the team overloaded?Tracked hours against available hours, per personTime tracking plus the leave calendar
Are we hitting commitments?Tasks completed versus planned in the periodTasks and completion percentage
How long does this work take?Actual hours against estimate, by task typeTime entries plus task estimates
Is someone stuck?Tasks open longer than usual with no completion movementTask history and daily work reports
What did this person contribute?Delivered work, reviewed by someone who understands itNot a metric. A manager.

The last row is the important one. There is no dashboard that evaluates professional judgement, and vendors who imply otherwise are selling comfort.

How should tracked hours be used, then?

  • As a denominator. Output per hour is interesting; hours alone are not.
  • In aggregate, for planning. "This kind of integration takes 40 hours, not 20" is the most valuable thing time data produces.
  • For pricing. Knowing what a retainer actually consumes turns renewal from a negotiation into arithmetic.
  • As a welfare signal. Consistent 11-hour days are worth a conversation before they become a resignation.
  • Never as a ranking. The moment hours become a league table, they stop being true.

What about teams where output is hard to see?

Support, operations and administrative work often lack a countable deliverable. Two things help, and neither is activity percentage:

  • Daily work reports. A few lines on what was done, written against a project. Low friction, and they accumulate into a record of the month that no metric captures.
  • Service-level outcomes. Queue depth, response time, resolution rate — measures of the function rather than the person.

Both are in Employee Desk; see workforce management.

A measurement set that works for most remote teams

  1. Hours per project, weeklyCaught early, an over-serviced retainer is a conversation. Caught in month five, it is a loss.
  2. Task completion against plan, per sprint or monthThe honest signal on whether commitments are realistic.
  3. Daily work reports, read not filedThe cheapest insight available, and the first thing to stop working if nobody reads them.
  4. Utilisation per person, monthlyFor capacity and for spotting overload. Not for comparison between people.
  5. A conversation, monthlyNothing above replaces a manager who knows what good work looks like in this role.

Frequently asked questions

Is the activity percentage a productivity score?

No. It measures the proportion of time intervals containing keyboard or mouse input. A developer reading a specification for two hours scores near zero while doing the most valuable work of the week. Treating it as productivity teaches people to generate input, which destroys the data.

What should we measure for a remote team instead?

Output against commitment: tasks completed versus planned, hours against estimate per project, cycle time, and whether the work met its definition of done. Tracked hours belong in that picture as the denominator, not as the score.

Are tracked hours useful at all?

Very, for the questions they actually answer: is this retainer profitable, is this team overloaded, how long does this kind of work really take. Those are planning and pricing questions, not performance ones.

Try it on your own team this week

Start a 7-day free trial, no card needed. Per-user pricing — pay only for active employees; admins are free.

  • 7-day trial
  • No credit card
  • Cancel anytime